Search plants, projects, owners, and states
150 MW Solar planned in Macon, GA
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
32.2800, -83.9900
County
Macon, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brenneman Solar LLC | Doral Renewables | — |
| Owner(s) | Brenneman Solar LLC | Doral Renewables LLC | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Doral Renewables LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Brenneman Solar Project is a 150 MW solar photovoltaic power plant located in Macon County, Georgia. The plant is owned and operated by Brenneman Solar LLC. It utilizes fixed-tilt solar tracking technology. The plant has one generator.
Brenneman Solar Project is the 14th largest solar plant in Georgia out of 29, and the 406th largest in the United States out of 639. The plant operates within the Southeastern Power Administration balancing authority and the SERC NERC region. The plant's primary fuel source is the sun.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southeastern Power Administration (SEPA)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $231.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Brenneman Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.