Search plants, projects, owners, and states
3 MW Batteries (2 MW) + Solar Photovoltaic (2 MW) operating in San Joaquin, CA
3 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2024
Operating Since
Coordinates
37.7887, -121.1945
County
San Joaquin, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Catalyze Manteca 730 Spreckels Avenue Microgrid | — |
| Owner(s) | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | — | — |
| Status | Operating | operating | — |
The CA Manteca 730 Spreckels Ave plant is a hybrid solar and battery energy storage system located in San Joaquin County, California. The plant has a total capacity of 3 MW and began operating in 2024. It is owned and operated by Catalyze Manteca 730 Spreckels Avenue Microgrid LLC. The facility consists of two generators utilizing both solar photovoltaic and battery technologies. The plant's solar array uses a fixed tilt tracking system.
The battery energy storage system (BESS) has a storage capacity of 3 MWh and a duration of 2 hours, utilizing lithium-ion battery chemistry. The plant's latest annual generation was 323 MWh, resulting in a capacity factor of 1.2%. The CA Manteca 730 Spreckels Ave plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 246 out of 300 facilities in California and 1064 out of 1205 nationally. The plant's primary fuel is listed as MWH, reflecting its reliance on stored energy.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
12 MWh
Net Discharge
323 MWh
Annual Net Energy
1.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Manteca Substation · 115 kV
Substation Distance
2.916 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
MANTECA_1_N002
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CA Manteca 730 Spreckels AveForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo