Query
CA Manteca 730 Spreckels Ave
Type
Entity Briefing
Entity
CA Manteca 730 Spreckels Ave
State
CA
Generated
2026-10-19T11:24:06.062Z

Briefing on CA Manteca 730 Spreckels Ave

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
1.2%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

CA Manteca 730 Spreckels Ave is a 3 MW Batteries asset in CAISO (California), currently Operating.

CA Manteca 730 Spreckels Ave is reported in California since 2024 under Catalyze Manteca 730 Spreckels Avenue Microgrid LLC. Available operating and financial measures include 1.2% capacity factor and 0 GWh annual generation; $1544/kW reported CapEx.

Location
San Joaquin, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Catalyze Manteca 730 Spreckels Avenue Microgrid LLC
Operator
Catalyze Manteca 730 Spreckels Avenue Microgrid LLC
Grid
CAISO (California)
Plant ID
66509

What stands out

1

CA Manteca 730 Spreckels Ave is a 3 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 1.2% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#171 of 202
National rank
#902 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.