CA Manteca 730 Spreckels Ave is a 3 MW Batteries asset in CAISO (California), currently Operating.
CA Manteca 730 Spreckels Ave is reported in California since 2024 under Catalyze Manteca 730 Spreckels Avenue Microgrid LLC. Available operating and financial measures include 1.2% capacity factor and 0 GWh annual generation; $1544/kW reported CapEx.
- Location
- San Joaquin, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Catalyze Manteca 730 Spreckels Avenue Microgrid LLC
- Operator
- Catalyze Manteca 730 Spreckels Avenue Microgrid LLC
- Grid
- CAISO (California)
- Plant ID
- 66509
What stands out
CA Manteca 730 Spreckels Ave is a 3 MW Batteries asset in California with status Operating.
Latest annual operating measures report 1.2% capacity factor and 0 GWh annual generation.
Available financial measures include $1544/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #171 of 202
- National rank
- #902 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.