Search plants, projects, owners, and states
140.3 MW Wind testing in Paulding, OH
140.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
—
Operating Since
Coordinates
41.0442, -84.5098
County
Paulding, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lotus Infrastructure Global Operations, LLC | Lotus Infrastructure Partners | — |
| Owner(s) | Lotus Infrastructure Global Operations, LLC | Renewstar LLC | — |
| Status | Testing | pre-construction | — |
GEM identifies the owner as Renewstar LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Grover Hill Wind, LLC is a 140.3 MW wind power plant located in Paulding County, Ohio. The facility utilizes onshore wind turbine technology and consists of one generator. It is operated by Lotus Infrastructure Global Operations, LLC. The plant's primary fuel source is wind (WND).
Grover Hill Wind operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is the fourth-largest wind farm in Ohio out of six, and ranks 555th nationally out of 734 wind plants. The plant has been the subject of two news articles, both pertaining to regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $246.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Latty co-op Substation · 69 kV
Substation Distance
4.454 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
HAVILAND34.5 KV GROVERWF
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Grover Hill Wind, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.