Search plants, projects, owners, and states
229.5 MW Batteries (77 MW) + Solar Photovoltaic (153 MW) under construction in Navarro, TX
229.5 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
32.5278, -96.4286
County
Navarro, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sunraycer Assets I LLC | Samsung C&T | — |
| Owner(s) | Sunraycer Assets I LLC | Sunraycer Renewables LLC | — |
| Status | Under construction | construction | — |
GEM identifies the owner as Sunraycer Renewables LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Gaia Hybrid plant, located in Navarro County, Texas, is a hybrid power plant with a total capacity of 229.5 MW. The plant is owned and operated by Sunraycer Assets I LLC. The primary fuel source is listed as 'MWH' reflecting its hybrid nature, incorporating both battery storage and solar photovoltaic generation. The facility consists of two generators utilizing these technologies. The solar component employs a fixed tilt tracking system.
Gaia Hybrid operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region TRE. In terms of size, the plant ranks as the 78th largest in Texas out of 224 plants, and nationally it is ranked 232 out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $312.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.