2 MW BESS operating in Twin Falls, ID
2 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
42.5716, -114.5951
Reference point reported to EIA.
County
Twin Falls, ID
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
Mapped facilities are available to inspect, but no route is selected.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Idaho Power Co | Idaho Power | — |
| Owner(s) | Idaho Power Co | IDACORP | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Filer BESS is a battery energy storage system located in Twin Falls County, Idaho. The plant has a total capacity of 2 MW and consists of a single generator. It began operating in 2025. The primary fuel type is electricity (MWH), indicating that the facility stores and discharges power rather than generating it directly from a fuel source.
The facility is owned by IDACORP and operated by Idaho Power Company. It is located within the Idaho Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. With a storage duration of 2 hours, Filer BESS is designed for short-term grid support. It is ranked as the 9th largest of 10 battery storage facilities in Idaho, and 1129th of 1205 nationally.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Idaho Power Company (IPCO)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Connection unresolved
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $2.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
175 buyers • 333 active contracts
+ 170 more offtakers in the full bridge. Top 5 shown.
Browse source data on FERC EQRNo insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.