40 MW BESS operating in Elmore, ID
40 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
42.9083, -115.1828
County
Elmore, ID
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Idaho Power Co | Idaho Power | — |
| Owner(s) | Idaho Power Co | IDACORP | — |
| Status | Operating | — | — |
Black Mesa BESS is a 40 MW battery energy storage system located in Elmore County, Idaho. The plant began operating in 2024 and has one generator. It is owned by IDACORP and operated by Idaho Power Company. The primary fuel type is electricity (MWH), and the storage technology consists of batteries. The battery system has a total storage capacity of 160 MWh, providing a duration of 4 hours. The battery chemistry is flow lithium battery (FLB).
The Black Mesa BESS operates within the Idaho Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 6th largest of 10 battery storage plants in Idaho, and 635th out of 1205 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Idaho Power Company (IPCO)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−116 MWh
Net Charging
-3.2K MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $54.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
175 buyers • 333 active contracts
+ 170 more offtakers in the full bridge. Top 5 shown.
Browse source data on FERC EQRNo insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Black Mesa BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.