112.1 MW Wind operating in Huron, MI
112.1 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2023
Operating Since
Coordinates
43.9717, -82.8418
County
Huron, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Deerfield Wind Energy 2, LLC | — | — |
| Owner(s) | Deerfield Wind Energy 2, LLC | — | — |
| Status | Operating | — | — |
Deerfield Wind Energy 2 is a 112.1 MW wind power plant located in Huron County, Michigan. The facility, owned and operated by Deerfield Wind Energy 2, LLC, commenced operations in 2023. It utilizes a single generator consisting of multiple onshore wind turbines. The plant is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the ReliabilityFirst Corporation (RFC) NERC region.
The plant's wind turbines have a hub height of 119 meters and a rotor diameter of 162 meters. The turbines were manufactured by Vestas, and the model is V162-6.0. In its most recent year of operation, Deerfield Wind Energy 2 generated 299,835 MWh of electricity, achieving a capacity factor of 30.5%. The plant is ranked as the 14th largest wind farm in Michigan out of 19, and 638th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
120.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
33.9K MWh
Latest Month
299.8K MWh
Annual Generation
30.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $197.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
DECO.DEERFLD
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Deerfield Wind Energy 2