Search plants, projects, owners, and states
112.2 MW Wind operating in Gray, KS
112.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2001
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
37.6133, -100.3782
Reference point reported to EIA.
County
Gray, KS
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 32.975 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Gray County Wind Energy LLC | NextEra Energy | — |
| Owner(s) | Gray County Wind Energy LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Gray County Wind Farm near Montezuma, Kansas was the largest wind farm in Kansas and the largest in the United States not mandated by a state regulatory commission back in 2001. The site consists of 170 Vestas V-47 wind turbines with a total nameplate capacity of 112 MW. Each turbine tower is 217 feet high, with blades 77 feet long, and a generating capacity of 660 kW. Owned and operated by NextEra Energy Resources, Gray County Wind Farm became fully operational in November 2001. Its construction cost an estimated $100 million. The average wind speed at the site is approximately 20 mph. The area is primarily used for farmland.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Gray County Wind Energy is a 112.2 MW wind power plant located in Gray County, Kansas. The plant began operating in 2001 and is owned and operated by Gray County Wind Energy LLC, a subsidiary of NextEra Energy. The facility consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Southwest Power Pool (SPP) balancing authority within the Midwest Reliability Organization (MRO) NERC region.
The wind farm utilizes Vestas V47-0.66 wind turbines, characterized by a 47-meter rotor diameter and a hub height of 65 meters. In the most recent year of reported data, the plant generated 264,095 MWh of electricity, achieving a capacity factor of 26.8%. Gray County Wind Energy ranks as the 41st largest wind farm in Kansas out of 44, and 637th nationally out of 734.
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
19.8K MWh
Latest Month
264.1K MWh
Annual Generation
26.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $212.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
SECI.UCU.GRAYWIND
Pricing Hub
SPPNORTH_HUB
Node Source
Curated node match
2 buyers • 7 active contracts
Last updated 2026-05-31
View all articlesA specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra entity test
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
GSPP Held LLC CSG
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.