Search plants, projects, owners, and states
365.5 MW Wind operating in Rosebud, MT
365.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2022
Operating Since
Coordinates
46.8177, -106.3789
County
Rosebud, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clearwater Energy Resources LLC | NextEra Energy | — |
| Owner(s) | Clearwater Energy Resources LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Clearwater Wind I is a 365.5 MW wind power plant located in Rosebud County, Montana. The facility began operating in 2022 and is owned by NextEra Energy, with Clearwater Energy Resources LLC as the operator. It ranks as the second-largest wind farm in Montana out of 11, and 48th nationally out of 734. The plant consists of a single generator utilizing onshore wind turbine technology.
The facility uses GE Wind GE2.82-127 turbines, with a rotor diameter of 127 meters and a hub height of 114 meters. In its most recent year of operation, Clearwater Wind I generated 1,328,889 MWh of electricity, achieving a capacity factor of 41.5%. The plant is located within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of Puget Sound Energy.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Puget Sound Energy (PSEI)
Grid Voltage
500.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
146.8K MWh
Latest Month
1.3M MWh
Annual Generation
41.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$1,407/kW
Est. Construction Cost
Total estimated cost: $514.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
1 buyer • 13 active contracts
Last updated 2026-04-19
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.