Search plants, projects, owners, and states
207.9 MW Wind operating in Custer, MT
207.9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.7896, -106.0021
Reference point reported to EIA.
County
Custer, MT
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 15.831 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Portland General Electric Co | NextEra Energy | — |
| Owner(s) | Portland General Electric Co | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Clearwater Wind East is a 207.9 MW wind power plant located in Custer County, Montana. The facility began operating in 2024 and is owned and operated by Clearwater Wind East, LLC, a subsidiary of NextEra Energy. The plant utilizes a single generator consisting of onshore wind turbines. Specifically, it employs GE2.82-127 wind turbines manufactured by GE Wind, with a hub height of 114 meters and a rotor diameter of 127 meters.
In its most recent year of operation, Clearwater Wind East generated 830,411 MWh of electricity, achieving a capacity factor of 45.6%. The plant is interconnected to the NorthWestern Energy (NWMT) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. Clearwater Wind East ranks as the 5th largest wind farm out of 11 in the state of Montana, and 243rd out of 734 nationally.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NorthWestern Energy (NWMT) (NWMT)
Grid Voltage
500.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
81.7K MWh
Latest Month
830.4K MWh
Annual Generation
45.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $439.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
155 buyers • 8,585 active contracts
+ 150 more offtakers in the full bridge. Top 5 shown.
Browse source data on FERC EQRLast updated 2026-05-31
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.