200 MW Batteries (50 MW) + Solar Photovoltaic (150 MW) operating in Lowndes, MS
200 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2024
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.4102, -88.6252
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
USPVDB reports uncertainty matching these polygons to EIA records.
Source imagery: 2026-01-19.
The reference point needs review; its current location has been retained.
County
Lowndes, MS
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Origis Energy USA, Inc | Origis Energy | — |
| Owner(s) | Origis Energy USA, Inc | Origis Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Golden Triangle II is a 200 MW hybrid power plant located in Lowndes County, Mississippi. The facility, owned and operated by Origis Energy USA, Inc., commenced operations in 2024. It combines solar photovoltaic generation with battery energy storage, using single-axis trackers for the solar panels. The plant's battery energy storage system (BESS) has a capacity of 200 MWh and a duration of 4 hours, utilizing lithium-ion battery chemistry (LIB). The primary fuel type is listed as MWH, reflecting the hybrid nature of the plant.
Golden Triangle II operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. In its latest year of operation, the plant generated 319,334 MWh, achieving a capacity factor of 18.2%. Financial data is available for the plant, sourced from LBNL Solar. The plant is ranked as the 3rd largest in Mississippi and 293rd nationally.
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
15.7K MWh
Latest Month
319.3K MWh
Annual Generation
18.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2024
$45.6/MWh
LCOE
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-07-11
View all articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.