Search plants, projects, owners, and states
6.4 MW Solar operating in Kern, CA
6.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
35.6133, -119.8668
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | The Greater Light USA LLC | Tesla | — |
| Owner(s) | The Greater Light USA LLC | — | — |
| Status | Operating | operating | — |
The Berrenda Mesa Water District is a 6.4 MW solar photovoltaic power plant located in Kern County, California. The plant began operating in 2023 and is owned and operated by The Greater Light USA LLC. Electricity generated by the facility is delivered to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. The plant utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, the Berrenda Mesa Water District plant generated 16,494 MWh of electricity, achieving a capacity factor of 29.3%. The plant is ranked 264th out of 862 solar facilities in California, and 2104th out of 7108 solar facilities nationally. Financial data is available for this plant from LBNL, indicating it is part of a broader research effort into the economics of solar power.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
3.44 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
727 MWh
Latest Month
16.5K MWh
Annual Generation
29.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2023–2024
$6.6/MWh
Energy Value
$8.7/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
BLACKWLL_7_N003
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Berrenda Mesa Water DistrictForward forecasts, scenario decomposition, and risk-decision tooling for this asset.