Berrenda Mesa Water District is a 6 MW Solar Photovoltaic asset in CAISO (California), currently Out of service.
Berrenda Mesa Water District is reported in California since 2023 under The Greater Light USA LLC. Available operating and financial measures include 29.3% capacity factor and 16 GWh annual generation; $6.6/MWh reported energy value.
- Location
- Kern, California
- Technology
- Solar Photovoltaic
- Owner / parent
- The Greater Light USA LLC
- Operator
- The Greater Light USA LLC
- Grid
- CAISO (California)
- Plant ID
- 65073
What stands out
Berrenda Mesa Water District is a 6 MW Solar Photovoltaic asset in California with status Out of service.
Latest annual operating measures report 29.3% capacity factor and 16 GWh annual generation.
Available financial measures include $6.6/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #336 of 992
- National rank
- #2488 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.