Query
Berrenda Mesa Water District
Type
Entity Briefing
Entity
Berrenda Mesa Water District
State
DC
Generated
2026-10-12T02:40:11.483Z

Briefing on Berrenda Mesa Water District

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
6 MW
Capacity
Out of service
Current status
2023
Operating since
1
Generators
29.3%
Capacity factor
16 GWh
Annual generation
Briefing/plantOut of service

Berrenda Mesa Water District is a 6 MW Solar Photovoltaic asset in CAISO (California), currently Out of service.

Berrenda Mesa Water District is reported in California since 2023 under The Greater Light USA LLC. Available operating and financial measures include 29.3% capacity factor and 16 GWh annual generation; $6.6/MWh reported energy value.

Location
Kern, California
Technology
Solar Photovoltaic
Owner / parent
The Greater Light USA LLC
Operator
The Greater Light USA LLC
Grid
CAISO (California)
Plant ID
65073

What stands out

1

Berrenda Mesa Water District is a 6 MW Solar Photovoltaic asset in California with status Out of service.

2

Latest annual operating measures report 29.3% capacity factor and 16 GWh annual generation.

3

Available financial measures include $6.6/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#336 of 992
National rank
#2488 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.