Search plants, projects, owners, and states
119 MW Solar planned in Jefferson, NY
119 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
39.1492, -75.5473
County
Jefferson, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EDF Renewables Development, Inc. | EDF Renewables | — |
| Owner(s) | EDF Renewables Development, Inc. | EDF Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as EDF Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Tracy Solar Energy Center is a 119 MW solar photovoltaic power plant located in Jefferson County, New York. The plant is owned and operated by EDF Renewables Development, Inc. It utilizes fixed-tilt solar tracking technology. As of the latest rankings, Tracy Solar is the 11th largest solar plant in New York State (out of 16) and the 509th largest in the United States (out of 639).
The plant consists of a single generator and operates within the New York Independent System Operator (NYISO) balancing authority, which falls under the Northeast Power Coordinating Council (NPCC) NERC region. The primary fuel source for the plant is solar energy (SUN). Recent news coverage related to the plant has focused on regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $307.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone D
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Tracy Solar Energy CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demoNew York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP