Tracy Solar Energy Center
119 MW generation in Jefferson, NY · In queue since October 2018 · Proposed COD November 2028
119 MW
Capacity
1
Components
Solar
7y 7m
In Queue
System Impact Study
IA Phase
COD target: 2028
Total Duration
10y 1m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-11-01
The Tracy Solar Energy Centre is a proposed 119 MW solar generation project located in Jefferson County, New York. Developed by EDF Renewables Development, Inc., the project is interconnected to the NYISO grid under queue ID NYISO-774, with an interconnection queue entry date of October 18, 2018. The proposed commercial operation date is November 1, 2028. The project's interconnection status is currently in the System Impact Study phase.
The Tracy Solar Energy Centre is linked to the existing Tracy Solar Energy Center operating plant (EIA plant ID 65051). Recent news coverage of the project includes regulatory matters.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Jefferson
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Tracy Solar Energy Center, LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Thousand Island - Lyme 115kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- NYISO Zone D
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Tracy Solar Energy CenterForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.