20 MW BESS operating in Chesterfield, VA
20 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
37.5000, -77.7000
County
Chesterfield, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dominion Energy Inc. | Dominion Energy | — |
| Owner(s) | Dominion Energy Inc. | Dominion Energy | — |
| Status | Operating | — | — |
Dry Bridge Storage is a 20 MW battery energy storage system (BESS) located in Chesterfield County, Virginia. The plant began operating in 2023 and is owned and operated by Dominion Energy Inc., a subsidiary of Dominion Energy. The facility utilizes one generator and has a total storage capacity of 80 MWh, providing a duration of 4 hours. The battery chemistry is Lithium Ion (LIB).
Dry Bridge Storage operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. It is ranked as the 11th largest of 12 battery storage plants in Virginia, and 694th nationally out of 1205 such facilities. The plant's primary fuel source is electricity (MWH), indicating it charges from the grid.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−317 MWh
Net Charging
-3.5K MWh
Annual Net Energy
-2.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $27.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Midlothian Substation · 500 kV
Substation Distance
0.459 km
Operator
Virginia Electric and Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
MIDLOTH 35 KV DRYBRIBS
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Dry Bridge StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.