Search plants, projects, owners, and states
114 MW Solar planned in New Castle, DE
114 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
39.3726, -75.5645
Reference point reported to EIA.
County
New Castle, DE
Nearby Plants
The route starts at a transmission substation on the mapped site; its link to the plant’s generation equipment is unconfirmed.
1 mapped line section connects the two facilities over 14.584 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPS Cedar Creek Solar LLC | Freepoint Commodities | — |
| Owner(s) | FPS Cedar Creek Solar LLC | Freepoint Commodities LLC | — |
| Status | Planned | pre-construction | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Cedar Creek Solar is a 114 MW solar photovoltaic power plant located in New Castle County, Delaware. It is the largest solar plant in the state and ranks 516th nationally out of 639 solar plants. The plant has one generator and utilizes fixed-tilt solar tracking technology. The primary fuel source is solar energy.
The plant is operated by FPS Cedar Creek Solar LLC and is located within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region. News coverage of the plant includes 5 articles related to industry, 2 on regulatory matters, and 1 covering deals.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $175.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Cedar Creek Substation · 230 kV
Substation Distance
0.219 km
Operator
Delmarva Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
CEDARCRE34.5 KV CEDARSP
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.