Cedar Creek 138 kV
50 MW generation in New Castle, DE · In queue since April 2026 · Proposed COD November 2028
50 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 7m
Study Phase
C01
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-11-01
The Cedar Creek 138 kV project is a proposed 50 MW solar generation development in New Castle County, Delaware. It is being developed by Freepoint Solar LLC and would connect to the transmission system at the Cedar Creek 138 kV point of interconnection, within the service territory of Delmarva Power & Light (DPL). The project has been submitted as a generation interconnection request under the queue identifier PJM-C01-1990.
The project is listed as active in the PJM Interconnection queue, which it entered on April 24, 2026. It is being evaluated in PJM's Cycle 1 (C01) study phase, and its proposed commercial operation date is November 1, 2028. The available data does not indicate the status of an interconnection agreement. The project has been linked to the existing operating facility Cedar Creek Solar (EIA plant ID 64543), with a match confidence of 0.79.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
DE
County
New Castle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Freepoint Solar LLC
Utility
DPL
Entity
PJM
Service Type
Generation Interconnection
Point of Interconnection
Cedar Creek 138 kV
Data Source
live-pjm_cycle
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CEDARCRE34.5 KV CEDARSP
- POI Substation
- Cedar Creek Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Cedar Creek 138 kVForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.