Search plants, projects, owners, and states
557 MW Solar under construction in Genesee, NY
557 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
43.0973, -78.2304
County
Genesee, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Hecate Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy Co LLC | — |
| Status | Under construction | pre-construction | — |
GEM identifies the owner as Greenbacker Renewable Energy Co LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Hecate Energy Cider Solar LLC is a 557 MW solar photovoltaic power plant located in Genesee County, New York. The primary fuel source is solar energy. The plant is operated by Greenbacker Renewable Energy Corporation. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Hecate Energy Cider Solar is the largest solar plant in New York State (ranked 1 of 16) and the 15th largest in the United States (ranked 15 of 639).
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $1.4B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
MILLSEAT___LFGE
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone B
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26
View all 7 articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo