Cider Solar (NYISO-811) — Project Summary

Queue ID
NYISO-811
Capacity
500 MW
Technology
Solar
Status
active
Location
Genesee, NY
Region
NYISO
Developer
Hecate Energy Cider Solar LLC
IA Status
System Impact Study

Cider Solar

NYISO-811BetaActiveSolarNYISOLBNL + Live

500 MW generation in Genesee, NY · In queue since April 2019 · Proposed COD January 2027

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

500 MW

Capacity

1

Components

Solar

7y 7m

In Queue

System Impact Study

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 9m

IA → COD

4 years

Total Duration

3y 9m

Construction25%
Queue EntryApr 3, 2019

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJan 11, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 12

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-01-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusUnder constructionecoportal.net · 2025-11-22
Latest milestonemajor construction began · 2023-06-03WGRZ · 2025-05-14
Expected CODQ4 2026WGRZ · 2025-05-14

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 1, 2027
From queue filing
Developer in saved assessment
Greenbacker Renewable Energy Company
Ownership change in saved research
Status at research time
Construction
LBNL shows active, at System Impact Study. On the ground, major construction began in May 2025 and steel piling is going in across about 2,500 acres in Elba/Oakfield.
Financing
Secured
$440M tax equity closed by Greenbacker (U.S. Bank and M&T Bank), reported Feb 2026. It was described as the final piece of the capital stack.
Ownership history
  1. —·Hecate Energy (Hecate Energy Cider Solar LLC)→Greenbacker Renewable Energy Companygreenbackercapital.com

Milestones in this assessment

Permit approvedJul 27, 2022

New York State (ORES) approved the permit for Hecate's Cider Solar, then the state's largest solar project.

pv-tech.org
GroundbreakingMay 14, 2025

Greenbacker announced the start of major construction activities on Cider Solar Farm.

greenbackercapital.com
Financing closeFeb 11, 2026Latest in this assessment

Greenbacker closed $440M in tax equity financing for the project.

pv-magazine-usa.com
Research sources and reasoning (7 recorded sources)

medium confidence at research time

  1. greenbackercapital.com/resources/construction-begins-on-new-yorks-largest-solar-energy-project
  2. pv-magazine-usa.com/2026/02/11/greenbacker-secures-440-million-tax-equity-for-new-yorks-largest-solar-project/
  3. mercomcapital.com/greenbacker-closes-440m-tax-equity-financing-cider-solar-project/
  4. finance.yahoo.com/news/energy-transition-cider-solar-project-113813472.html
  5. pv-tech.org/hecate-energy-secures-permit-for-new-yorks-largest-solar-project/
  6. hoodline.com/2026/09/steel-piling-rises-across-2-500-acres-in-genesee-county-for-ny-s-biggest-solar-farm/
  7. hecateenergy.com/case-studies/cider-solar/

Commercial operation date: None of the news or search results state a COD, so only the LBNL proposed COD of 2027-01-01 exists. Construction began in May 2025 and the capital stack closed in Feb 2026 ("final piece of the capital stack"), so 2027 is plausible but not independently confirmed.

Developer: LBNL and older news name Hecate Energy as developer. Greenbacker's announcement calls it "its Cider Solar Farm" and Greenbacker closed the tax equity financing, so it is the current owner. Hecate's case study says it developed and permitted the project and is managing construction.

Status: Greenbacker announced the start of major construction in May 2025, and Hoodline reported piling underway in Sept 2026. The LBNL IA status is stale relative to this.

Project lifecycle
as of 2025-11-22
PhaseConstructionTheDailyNewsOnline.com · 2025-02-08
OperationalNoecoportal.net · 2025-11-22
TechnologySolarecoportal.net · 2025-11-22
DeveloperEDF Renewables±ecoportal.net · 2025-11-22
GroundbreakingAnnouncedecoportal.net · 2025-11-22
Permit decisionpendingThe Batavian · 2021-06-16

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Cider Solar is a proposed 500 MW solar generation project located in Genesee County, New York. The developer is Hecate Energy Cider Solar LLC, and the interconnecting utility is NYPA. The project is in the NYISO interconnection queue as entry NYISO-811, with a queue entry date of April 3, 2019, and a proposed commercial operation date of January 1, 2027. Its interconnection status is currently at the System Impact Study phase.

The proposed project is linked to the existing Hecate Energy Cider Solar LLC operating plant (EIA ID 64163). Cider Solar has been the subject of recent news coverage, with 19 articles appearing in the press.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Genesee

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Hecate Energy Cider Solar LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

Dysinger - New Rochester 345kV

Data Source

LBNL + Live

ApplicantHecate EnergyPV Tech · 2022-07-27
AgencyNew York StatePV Tech · 2022-07-27
RulingApprovalPV Tech · 2022-07-27
TransactionTax equity±Yahoo Finance · 2026-02-28
Deal value$440.0M±Yahoo Finance · 2026-02-28
LenderU.S. Bank and M&T BankYahoo Finance · 2026-02-28
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
GENESE
Hub Confidence
MEDIUM
Nearest Node (Estimated)
323607
POI Substation
MILLSEAT___LFGE

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (10)Beta

Last updated 2026-03-26

View all 10 articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.