2.4 MW Distillate Oil operating in Accomack, VA
2.4 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
1993
Operating Since
Coordinates
37.8277, -75.9915
County
Accomack, VA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | A & N Electric Coop | — | — |
| Owner(s) | A & N Electric Coop | — | — |
| Status | Operating | — | — |
The Tangier power plant is located in Accomack County, Virginia. It is owned and operated by A & N Electric Coop. The plant's primary fuel source is distillate fuel oil (DFO), and it utilizes petroleum liquid-based technologies for power generation. Commissioned in 1993, the facility has a total capacity of 2.4 MW distributed across two generators. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year with available data, the Tangier plant generated 203 MWh of electricity. This corresponds to a capacity factor of approximately 1.0%. In terms of size, the Tangier plant is ranked as the 27th largest out of 32 power plants in Virginia, and 709th largest out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
7 MWh
Latest Month
203 MWh
Annual Generation
1.0%
Capacity Factor
CO₂ Intensity
1776 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
35 lb/MWh
SO₂
3 lb/MWh
CH₄
0.072 lb/MWh
N₂O
0.014 lb/MWh
Capacity Factor
0.4%
Annual Net Gen
0 GWh
CO₂eq
1782 lb/MWh
Subregion
RFC East
2013
$765/kW
Est. Construction Cost
Total estimated cost: $1.8M
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
Plant coordinates only
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Tangier