Search plants, projects, owners, and states
4 MW Distillate Oil standby in Accomack, VA
4 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
2002
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
37.7453, -75.7202
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Accomack, VA
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 6.074 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Old Dominion Electric Coop | — | — |
| Owner(s) | Old Dominion Electric Coop | — | — |
| Status | Standby | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Onancock Diesel Generation Facility is a 4 MW peaking power plant located in Accomack County, Virginia. The plant began operating in 2002 and is owned and operated by Old Dominion Electric Cooperative. It consists of two generators utilizing petroleum liquids as their primary fuel source. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region.
In its latest year of operation, the Onancock Diesel Generation Facility generated 264 MWh of electricity, achieving a capacity factor of 0.7%. The plant's relatively low capacity factor reflects its role as a peaking plant, dispatched primarily during periods of high electricity demand. Among similar plants in Virginia, the Onancock facility ranks 21st out of 32 in terms of capacity, and it holds a national ranking of 592 out of 886.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9 MWh
Latest Month
264 MWh
Annual Generation
0.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1576 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
31 lb/MWh
SO₂
3 lb/MWh
CH₄
0.064 lb/MWh
N₂O
0.013 lb/MWh
Capacity Factor
0.3%
Annual Net Gen
0 GWh
CO₂eq
1581 lb/MWh
Subregion
RFC East
2013
$765/kW
Est. Construction Cost
Total estimated cost: $3.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Green Bush Switch Station · 69 kV
Substation Distance
4.559 km
Operator
Old Dominion Electric Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
TASLEY 12 KV G10
Pricing Hub
DOMINION HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.