Search plants, projects, owners, and states
1.2 MW Solar operating in San Luis Obispo, CA
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.3221, -120.7326
County
San Luis Obispo, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ecoplexus, Inc | Ecoplexus | — |
| Owner(s) | Ecoplexus, Inc | — | — |
| Status | Operating | operating | — |
Camp San Luis Obispo is a solar photovoltaic power plant located in San Luis Obispo County, California. The plant has a total capacity of 1.2 MW and began operating in 2024. It is owned and operated by Ecoplexus, Inc. The plant utilizes a single generator and employs fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy. In its latest year of operation, Camp San Luis Obispo generated 158 MWh of electricity, resulting in a capacity factor of 1.5%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Camp San Luis Obispo ranks as the 700th largest solar plant in California out of 862, and 6146th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
158 MWh
Annual Generation
1.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $1.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Goldtree · 12 kV
Substation Distance
3.576 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GOLDTREE_1_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Camp San Luis ObispoForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo