Query
Camp San Luis Obispo
Type
Entity Briefing
Entity
Camp San Luis Obispo
State
LA
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Camp San Luis Obispo

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
1.5%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Camp San Luis Obispo is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Camp San Luis Obispo is reported in California since 2024 under Ecoplexus, Inc. Available operating and financial measures include 1.5% capacity factor and 0 GWh annual generation; $1544/kW reported CapEx.

Location
San Luis Obispo, California
Technology
Solar Photovoltaic
Owner / parent
Ecoplexus, Inc
Operator
Ecoplexus, Inc
Grid
CAISO (California)
Plant ID
63870

What stands out

1

Camp San Luis Obispo is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 1.5% capacity factor and 0 GWh annual generation.

3

Available financial measures include $1544/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#832 of 992
National rank
#6982 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.