1.5 MW Natural Gas operating in Santa Clara, CA
1.5 MW
Nameplate Capacity
1
Generators
unit
Other Natural Gas
Technology
2018
Operating Since
Coordinates
37.3499, -121.9406
County
Santa Clara, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 2016 ESA Project Company, LLC | — | — |
| Owner(s) | 2016 ESA Project Company, LLC | — | — |
| Status | Operating | — | — |
The El Camino Real Fuel Cell facility, identified by plant ID 63715, is located in Santa Clara County, California. The plant has a total capacity of 1.5 MW and is operated by 2016 ESA Project Company, LLC. It commenced operations in 2018 and utilizes natural gas as its primary fuel source, employing "Other Natural Gas" technology. The facility consists of a single generator.
The El Camino Real Fuel Cell plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year with available data, the plant generated 11,943 MWh of electricity, achieving a capacity factor of 90.6%. The plant's size ranks it as the 253rd largest in California out of 297 plants, and 1772nd nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.0K MWh
Latest Month
11.9K MWh
Annual Generation
90.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$837/kW
Est. Construction Cost
Total estimated cost: $1.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Brokaw Substation
Substation Distance
1.418 km
Operator
Silicon Valley Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
CSCGNRA1_7_N101
Pricing Hub
TH_NP15_GEN-APND
Alt. Hub / Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about SCU000 El Camino Real Fuel CellForward forecasts, scenario decomposition, and risk-decision tooling for this asset.