SCU000 El Camino Real Fuel Cell is a 2 MW Other Natural Gas asset in CAISO (California), currently Operating.
SCU000 El Camino Real Fuel Cell is reported in California since 2018 under 2016 ESA Project Company, LLC. Available operating and financial measures include 90.6% capacity factor and 12 GWh annual generation; $837/kW reported CapEx.
- Location
- Santa Clara, California
- Technology
- Other Natural Gas
- Owner / parent
- 2016 ESA Project Company, LLC
- Operator
- 2016 ESA Project Company, LLC
- Grid
- CAISO (California)
- Plant ID
- 63715
What stands out
SCU000 El Camino Real Fuel Cell is a 2 MW Other Natural Gas asset in California with status Operating.
Latest annual operating measures report 90.6% capacity factor and 12 GWh annual generation.
Available financial measures include $837/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #259 of 303
- National rank
- #1839 of 2,025
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.