61.4 MW Natural Gas operating in Loudon, TN
61.4 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2016
Operating Since
Coordinates
35.7351, -84.3193
County
Loudon, TN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PRIMIENT, LLC | — | — |
| Owner(s) | PRIMIENT, LLC | — | — |
| Status | Operating | — | — |
The Primient Loudon Plant is a 61.4 MW natural gas-fired power plant located in Loudon County, Tennessee. The plant began operating in 2016 and is owned and operated by Primient, LLC. It consists of two natural gas-fired combustion turbine generators. The plant operates within the Tennessee Valley Authority balancing authority and the SERC NERC region.
In its most recent year of operation, the Primient Loudon Plant generated 393,562 MWh of electricity, achieving a capacity factor of 73.0%. The plant is ranked as the 10th largest of 15 power plants in Tennessee, and 1051st largest of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
161.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
37.3K MWh
Latest Month
393.6K MWh
Annual Generation
73.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1325 lb/MWh
NOx
4 lb/MWh
SO₂
0.036 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
74.8%
Annual Net Gen
402 GWh
CO₂eq
1327 lb/MWh
Subregion
SERC Tennessee Valley
2016
$895/kW
Est. Construction Cost
Total estimated cost: $55.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
Last updated 2026-03-26
View all 5 articlesNo Ask reports yet for this entity.
Ask about Primient Loudon PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo