Search plants, projects, owners, and states
42 MW Wind operating in Cerro Gordo, IA
42 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
43.0616, -93.4567
County
Cerro Gordo, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cerro Gordo Wind Farm | NextEra Energy | — |
| Owner(s) | Cerro Gordo Wind Farm | NextEra Energy | — |
| Status | Operating | retired | — |
Cerro Gordo Wind Farm is a 42 MW wind power facility located in Cerro Gordo County, Iowa. The plant began operating in 2020 and is owned and operated by NextEra Energy, under the listed EIA operator name Cerro Gordo Wind Farm. The facility consists of a single generator utilizing onshore wind turbine technology. The plant is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the MRO NERC region.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 116 meters. The turbines are manufactured by GE Wind, model GE2.3-116. In its most recent year of operation, Cerro Gordo Wind Farm generated 167,792 MWh of electricity, achieving a capacity factor of 45.7%. Cerro Gordo Wind Farm ranks 74th out of 122 wind facilities in the state of Iowa, and 968th out of 1424 wind facilities nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.4K MWh
Latest Month
167.8K MWh
Annual Generation
45.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2020
$1,598/kW
Est. Construction Cost
Total estimated cost: $67.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.CERROG1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.