Search plants, projects, owners, and states
20 MW Solar under construction in Cayuga, NY
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
42.7443, -76.6653
County
Cayuga, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dog Corners Solar NY LLC | SunEast Development | — |
| Owner(s) | Dog Corners Solar NY LLC | Cordelio Power | — |
| Status | Under construction | pre-construction | — |
GEM identifies the owner as Cordelio Power
This entity is not yet in the GEM ownership database — chain unavailable.
The SunEast Dog Corners Solar Project is a 20 MW solar photovoltaic power plant located in Cayuga County, New York. The plant, identified by plant ID 62823, is owned and operated by Dog Corners Solar NY LLC. It utilizes fixed-tilt solar tracking technology. The plant connects to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
The SunEast Dog Corners Solar Project is one of 695 power plants in New York, ranking 34th in the state by capacity. Nationally, it ranks 1410 out of 7108 power plants. The facility consists of a single generator and uses solar energy as its primary fuel source.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $51.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
GENESE
Node Source
Plant coordinates only
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about SunEast Dog Corners Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.