Search plants, projects, owners, and states
10 MW Distillate Oil operating in Bristol, MA
10 MW
Nameplate Capacity
4
Generators
units
Petroleum Liquids
Technology
2018
Operating Since
Coordinates
41.8808, -71.0928
County
Bristol, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Taunton - (MA) | — | — |
| Owner(s) | City of Taunton | — | — |
| Status | Operating | — | — |
The West Water Street plant is a 10 MW petroleum-liquid-fueled power plant located in Bristol County, Massachusetts. It began operating in 2018 and consists of 4 generators utilizing petroleum liquids technology. The plant is owned and operated by the City of Taunton. It operates within the ISO New England Inc. balancing authority and the NPCC NERC region.
In the most recent year with available data, the plant generated 1,828 MWh of electricity, achieving a capacity factor of 2.1%. West Water Street is ranked as the 9th largest of 17 petroleum-liquid-fueled plants in Massachusetts, and 341st out of 886 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
704 MWh
Latest Month
1.8K MWh
Annual Generation
2.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1555 lb/MWh
NOx
32 lb/MWh
SO₂
3 lb/MWh
CH₄
0.063 lb/MWh
N₂O
0.013 lb/MWh
Capacity Factor
1.5%
Annual Net Gen
1 GWh
CO₂eq
1560 lb/MWh
Subregion
NPCC New England
2018
$687/kW
Est. Construction Cost
Total estimated cost: $6.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
West Water Street Substation · 115 kV
Substation Distance
2.033 km
Operator
Taunton Municipal Lighting Plant
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.TAUNTON 13.8CL9C
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.