121 MW Batteries (3 MW) + Natural Gas Fired Combined Cycle (118 MW) operating in Bristol, MA
121 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Batteries + Natural Gas Fired Combined Cycle
1975
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
41.8652, -71.1066
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Bristol, MA
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 0.040 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Taunton - (MA) | — | — |
| Owner(s) | City of Taunton - (MA), Town of Hudson - (MA), Town of North Attleborough - (MA) | — | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Cleary Flood Hybrid is a 121 MW hybrid power plant located in Bristol County, Massachusetts. The plant, which began operating in 1975, is owned and operated by the City of Taunton. It utilizes natural gas fired combined cycle technology as its primary energy source, and also incorporates battery storage. The battery energy storage system (BESS) has a capacity of 6 MWh and a duration of 2 hours, using lithium-ion battery chemistry. Cleary Flood Hybrid operates within the ISO New England Inc. balancing authority and the NPCC NERC region.
The plant consists of 3 generators and is ranked as the 14th largest out of 15 power plants in Massachusetts, and 879th nationally out of 945 plants. In the most recent year of data, Cleary Flood Hybrid generated 132,569 MWh of electricity, resulting in a capacity factor of 12.4%.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.1K MWh
Latest Month
132.6K MWh
Annual Generation
12.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1368 lb/MWh
NOx
2 lb/MWh
SO₂
0.015 lb/MWh
CH₄
0.027 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
4.7%
Annual Net Gen
50 GWh
CO₂eq
1370 lb/MWh
Subregion
NPCC New England
2013
$965/kW
Est. Construction Cost
Total estimated cost: $116.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Cleary-Flood Substation · 115 kV
Substation Distance
< 10 km
Operator
Taunton Municipal Lighting Plant
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
Taunton Node
Pricing Hub
.H.INTERNAL_HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
Massachusetts growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ISO New England
Summary analysis with parallel narrative sections and visualizations.
Cleary Flood Hybrid
Data-driven briefing on Cleary Flood Hybrid — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.