Cleary Flood Hybrid is a 121 MW Batteries asset in ISO New England, currently Operating.
Cleary Flood Hybrid is reported in Massachusetts since 1975 under City of Taunton - (MA). Available operating and financial measures include 12.4% capacity factor and 133 GWh annual generation; $965/kW reported CapEx.
- Location
- Bristol, Massachusetts
- Technology
- Batteries, Natural Gas Fired Combined Cycle
- Owner / parent
- City of Taunton - (MA)
- Operator
- City of Taunton - (MA)
- Grid
- ISO New England
- Plant ID
- 1682
What stands out
Cleary Flood Hybrid is a 121 MW Batteries asset in Massachusetts with status Operating.
Latest annual operating measures report 12.4% capacity factor and 133 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #14 of 40
- National rank
- #905 of 2,025
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.