Search plants, projects, owners, and states
10 MW Hydro planned in Grenada, MS
10 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Coordinates
33.8088, -89.7725
County
Grenada, MS
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | — | — |
| Owner(s) | Rye Development | — | — |
| Status | Planned | — | — |
The Grenada Lake Hydroelectric Project is a 10 MW conventional hydroelectric power plant located in Grenada County, Mississippi. It is owned and operated by Rye Development. The plant utilizes water (WAT) as its primary fuel source and consists of two generators. It is the second-largest of four hydroelectric plants in Mississippi, and ranks 664th out of 1464 hydroelectric facilities nationally.
The Grenada Lake Hydroelectric Project operates within the Tennessee Valley Authority balancing authority and is situated in the SERC NERC region. The plant's operations have been mentioned in two news articles, both pertaining to the industry category.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $14.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Grenada Lake Hydroelectric ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.