Briefing on Grenada Lake Hydroelectric Project

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
10 MW
Capacity
Planned
Current status
2
Generators
Briefing/plantPlanned

Grenada Lake Hydroelectric Project is a 10 MW Conventional Hydroelectric asset in Mississippi, currently Planned.

Grenada Lake Hydroelectric Project is reported in Mississippi under Rye Development. Available operating and financial measures include $1415/kW reported CapEx.

Location
Grenada, Mississippi
Technology
Conventional Hydroelectric
Owner / parent
Rye Development
Operator
Rye Development
Grid
Tennessee Valley Authority
Plant ID
62430

What stands out

1

Grenada Lake Hydroelectric Project is a 10 MW Conventional Hydroelectric asset in Mississippi with status Planned.

2

Available financial measures include $1415/kW CapEx.

Market and operating context

Balancing authority
Tennessee Valley Authority
NERC region
SERC
State rank
#2 of 4
National rank
#655 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Grenada Lake Hydroelectric Project — verified asset snapshot

FieldValue
LocationGrenada, Mississippi
TechnologyConventional Hydroelectric
Owner / parentRye Development
OperatorRye Development
GridTennessee Valley Authority
Plant ID62430
Balancing authorityTennessee Valley Authority
NERC regionSERC