300 MW Hydro operating in Tuolumne, CA
300 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1979
Operating Since
Coordinates
37.9469, -120.5282
County
Tuolumne, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | U S Bureau of Reclamation | US Bureau of Reclamation | — |
| Owner(s) | U S Bureau of Reclamation | US Bureau of Reclamation | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Bureau of Reclamation
This entity is not yet in the GEM ownership database — chain unavailable.
New Melones Dam is an earth and rock filled embankment dam on the Stanislaus River, about 5 miles (8.0 km) west of Jamestown, California, United States, on the border of Calaveras County and Tuolumne County. The water impounded by the 625-foot-tall (191 m) dam forms New Melones Lake, California's fourth-largest reservoir, in the foothills of the Sierra Nevada east of the San Joaquin Valley. The dam serves mainly for irrigation water supply, and also provides hydropower generation, flood control, and recreation benefits.
Read more on WikipediaLocated in Tuolumne County, California, New Melones is a 300 MW hydroelectric power plant that began operating in 1979. The plant utilizes conventional hydroelectric technology and is owned and operated by the U.S. Bureau of Reclamation. It consists of two generators and uses water (WAT) as its primary fuel source. New Melones is connected to the Balancing Authority of Northern California and operates within the Western Electricity Coordinating Council (WECC) NERC region.
In terms of its size and output, New Melones ranks as the 9th largest out of 42 hydroelectric plants in California, and 69th nationally out of 194 plants. The plant's latest annual generation was 270,595 MWh, resulting in a capacity factor of 10.3%.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Balancing Authority of Northern California (BANC)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.0K MWh
Latest Month
270.6K MWh
Annual Generation
10.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $688.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about New MelonesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.