300 MW Hydro operating in Lewis, WA
300 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1968
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
46.5354, -122.4256
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Lewis, WA
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
2 mapped line sections connect the two facilities over 18.925 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Tacoma - (WA) | Tacoma Power | — |
| Owner(s) | City of Tacoma - (WA) | Tacoma Power | — |
| Status | Operating | operating | — |
Mossyrock Dam is a concrete double-arch-gravity dam on the Cowlitz River near Mossyrock in Lewis County, Washington, United States. The reservoir created by the dam is called Riffe Lake. The primary purpose of the dam is hydroelectric production while flood control is a secondary function. The dam is the tallest in Washington state and its hydroelectric power station supplies 40% of Tacoma Power's electricity.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Mossyrock is a 300 MW hydroelectric power plant located in Lewis County, Washington. The plant began operating in 1968 and is owned and operated by the City of Tacoma - (WA). It utilizes conventional hydroelectric technology with water as its primary fuel source. The facility consists of 2 generators. Mossyrock is the 14th largest power plant in Washington out of 23, and ranks 71st nationally out of 194 plants.
In the most recent year of data, Mossyrock generated 902,717 MWh of electricity, achieving a capacity factor of 34.3%. The plant operates within the Western Electricity Coordinating Council (WECC) NERC region, and its balancing authority is the City of Tacoma, Department of Public Utilities, Light Division.
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
City of Tacoma, Department of Public Utilities, Light Division (TPWR)
Grid Voltage
240.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
185.2K MWh
Latest Month
902.7K MWh
Annual Generation
34.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $688.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesIMPA Washington Solar Park
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
IMPA Washington Solar Park 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Hydro Plant
Data tables and metrics from the InfraSure database.
Washington
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.