Search plants, projects, owners, and states
189.9 MW Batteries (10 MW) + Solar Photovoltaic (180 MW) operating in Upton, TX
189.9 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2018
Operating Since
Coordinates
31.2625, -102.2795
County
Upton, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Upton County Solar 2 LLC | Vistra | — |
| Owner(s) | Upton County Solar 2 LLC | Vistra | — |
| Status | Operating | operating | — |
Castle Gap Solar Hybrid is a 189.9 MW hybrid power plant located in Upton County, Texas. The plant, which began operating in 2018, is owned by Vistra and operated by Upton County Solar 2 LLC. It utilizes both solar photovoltaic technology and battery energy storage. The facility consists of two generators and is fueled by energy from renewable sources (MWH). The solar component uses single-axis tracking. The battery energy storage system (BESS) has a capacity of 42 MWh, providing 4.24 hours of duration and using lithium-ion battery (LIB) chemistry.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In the most recent year with available data, Castle Gap Solar Hybrid generated 384,210 MWh, achieving a capacity factor of 23.1%. Castle Gap Solar Hybrid is ranked as the 136th largest power plant in Texas out of 224, and 333rd nationally out of 514. Financial data is available for this plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
22.7K MWh
Latest Month
384.2K MWh
Annual Generation
23.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2018–2024
$22.8/MWh
Energy Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Upton County Solar 1 Substation · 138 kV
Substation Distance
0 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CASL_GAP_UN1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Castle Gap Solar HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo