Search plants, projects, owners, and states
190 MW Batteries (65 MW) + Solar Photovoltaic (125 MW) operating in Clark, NV
190 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
36.0617, -115.7950
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
USPVDB reports uncertainty matching these polygons to EIA records.
Source imagery: 2024-07-21.
The reference point needs review; its current location has been retained.
County
Clark, NV
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
2 mapped line sections connect the two facilities over 16.688 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Yellow Pine Solar, LLC | NextEra Energy Inc | — |
| Owner(s) | Yellow Pine Solar, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Yellow Pine Solar is a 190 MW hybrid power plant located in Clark County, Nevada. The facility, which began operating in 2023, is owned by NextEra Energy and operated by Yellow Pine Solar, LLC. It utilizes both solar photovoltaic technology and battery storage. The plant has two generators and is fueled by electricity (MWH). The battery energy storage system (BESS) has a capacity of 260 MWh, providing 4 hours of duration and using lithium-ion (LIB) chemistry. The solar component uses single-axis tracking.
Yellow Pine Solar operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its first year of operation, the plant generated 376,251 MWh, achieving a capacity factor of 22.6%. The plant holds a rank of 17 out of 20 solar facilities in Nevada and 330 out of 514 nationally. Financial data indicates a power purchase agreement (PPA) price of $19.75 per MWh.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Nevada Power Company (NEVP)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
18.8K MWh
Latest Month
376.3K MWh
Annual Generation
22.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Yellow Pine Solar, LLC · Data from 2023–2025
$15.0/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
2 buyers • 22 active contracts
Last updated 2026-05-31
View all 6 articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.