Search plants, projects, owners, and states
196.7 MW Wind operating in Glasscock, TX
196.7 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2018
Operating Since
Coordinates
31.7740, -101.5908
County
Glasscock, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bearkat Wind Energy 1, LLC | Tri Global Energy | — |
| Owner(s) | Bearkat Wind Energy 1, LLC | Copenhagen Infrastructure Partners Holding | — |
| Status | Operating | operating | — |
Bearkat is a 196.7 MW wind power plant located in Glasscock County, Texas. The facility began operating in 2018 and utilizes onshore wind turbine technology. It consists of one generator and is owned by Copenhagen Infrastructure Partners Holding, a company based in Denmark. The operator listed with the EIA is Bearkat Wind Energy 1, LLC.
The plant's turbines have a hub height of 87 meters and a rotor diameter of 126 meters. The wind turbines were manufactured by Vestas and are model V126-3.45. In its latest year of reported generation, Bearkat produced 648,295 MWh, achieving a capacity factor of 37.6%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It is ranked as the 115th largest plant in Texas out of 200, and 375th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
59.4K MWh
Latest Month
648.3K MWh
Annual Generation
37.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2018
$1,183/kW
Est. Construction Cost
Total estimated cost: $232.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Last updated 2026-03-26
View all 5 articlesNo Ask reports yet for this entity.
Ask about BearkatForward forecasts, scenario decomposition, and risk-decision tooling for this asset.