Search plants, projects, owners, and states
3.2 MW Landfill Gas operating in Bannock, ID
3.2 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2014
Operating Since
Coordinates
42.7878, -112.3656
County
Bannock, ID
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bannock County Landfill - (ID) | — | — |
| Owner(s) | Bannock County Landfill | — | — |
| Status | Operating | — | — |
Bannock County LFG to Energy is a 3.2 MW landfill gas-fueled power plant located in Bannock County, Idaho. The facility began operating in 2014 and is owned and operated by Bannock County Landfill. It consists of two generators utilizing landfill gas technology. The plant is interconnected to the Idaho Power Company balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of reported generation, the plant produced 12,710 MWh of electricity, achieving a capacity factor of 45.3%. Bannock County LFG to Energy is the fourth-largest landfill gas plant in Idaho, out of a total of four such facilities in the state. Nationally, it ranks as the 164th largest among 284 landfill gas power plants.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Idaho Power Company (IPCO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Political Subdivision
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.1K MWh
Latest Month
12.7K MWh
Annual Generation
45.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.346 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
44.6%
Annual Net Gen
12 GWh
CO₂eq
0.000 lb/MWh
Subregion
WECC Northwest
2014
$1,987/kW
Est. Construction Cost
Total estimated cost: $6.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Bannock County LFG to EnergyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.