Search plants, projects, owners, and states
49.9 MW Wood Waste out of service in Tyler, TX
49.9 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2014
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | East Texas Electric Coop, Inc | East Texas Electric Cooperative | — |
| Owner(s) | East Texas Electric Coop, Inc | East Texas Electric Cooperative | — |
| Status | Out of service | mothballed | — |
The Woodville Renewable Power Project is a 49.9 MW biomass power plant located in Tyler County, Texas. The plant began operating in 2014 and is owned and operated by East Texas Electric Cooperative. It utilizes wood and wood waste as its primary fuel source, employing one generator with wood/wood waste biomass technology.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. Among biomass plants in Texas, the Woodville Renewable Power Project ranks as the second largest of three such facilities. Nationally, it holds the 23rd position out of 97 biomass power plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2014
$1,987/kW
Est. Construction Cost
Total estimated cost: $99.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ESS.WRPP1
Pricing Hub
TEXAS.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Woodville Renewable Power ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.