Search plants, projects, owners, and states
50 MW Wood Waste operating in Craven, NC
50 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1990
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
35.1292, -77.1680
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Craven, NC
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
2 mapped line sections connect the two facilities over 12.170 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CMS Generation Operating Co II | CMS Generation Operating | — |
| Owner(s) | Atlantic Power Corporation, CMS Generation MI Power LLC | CMS Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Craven County Wood Energy LP is a 50 MW biomass power plant located in Craven County, North Carolina. The plant began operating in 1990 and is owned by CMS Energy, with CMS Generation Operating Co II as the listed operator. The primary fuel source is wood and wood waste (WDS), and the plant utilizes one generator. It is one of three biomass plants in North Carolina, and ranks 22nd out of 97 similar plants nationally.
The plant operates within the Duke Energy Progress East balancing authority and the SERC NERC region. In the most recent year with available data, Craven County Wood Energy LP generated 284,361 MWh of electricity, achieving a capacity factor of 64.9%.
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Progress East (CPLE)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
21.4K MWh
Latest Month
284.4K MWh
Annual Generation
64.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
28 lb/MWh
NOx
3 lb/MWh
SO₂
2 lb/MWh
CH₄
1 lb/MWh
N₂O
0.142 lb/MWh
Capacity Factor
70.7%
Annual Net Gen
310 GWh
CO₂eq
96 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $174.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Duke Energy renewed a long-term power purchase agreement with the 50-MW wood/poultry-waste biomass facility in Craven County, NC, helping satisfy state biomass energy mandates.
source