200 MW Solar planned in La Paz, AZ
200 MW
Nameplate Capacity
1
Generators
unit
Solar Thermal without Energy Storage
Technology
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.9172, -114.2675
Reference point reported to EIA.
County
La Paz, AZ
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Enviromission, Inc | EnviroMission | — |
| Owner(s) | Enviromission, Inc | EnviroMission Inc | — |
| Status | Planned | announced | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
La Paz Solar Tower is a 200 MW solar thermal power plant located in La Paz County, Arizona. The plant, owned and operated by Enviromission, Inc., utilizes a fixed-tilt solar tracking system. It is the 6th largest solar plant in Arizona out of 23, and ranks 211th nationally among 639 solar plants. The plant's primary fuel source is the sun, and it operates without energy storage.
The plant connects to the grid within the Western Electricity Coordinating Council (WECC) region. Its balancing authority is the Western Area Power Administration - Desert Southwest Region. The plant has one generator.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Western Area Power Administration - Desert Southwest Region (WALC)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Connection unresolved
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $308.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-19
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
IPC 25 Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.