Search plants, projects, owners, and states
98 MW Natural Gas operating in Ingham, MI
98 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2013
Operating Since
Coordinates
42.7198, -84.5510
County
Ingham, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lansing Board of Water and Light | Lansing Board of Water and Light | — |
| Owner(s) | Lansing Board of Water and Light | Lansing Board of Water and Light | — |
| Status | Operating | — | — |
The Lansing BWL REO Town Plant is a 98 MW natural gas-fired combined cycle power plant located in Ingham County, Michigan. The plant began operating in 2013 and is owned and operated by the Lansing Board of Water and Light. It consists of three generators utilizing combined cycle technology.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In the state of Michigan, the Lansing BWL REO Town Plant ranks as the 26th largest out of 62 power plants. Nationally, it is ranked 950 out of 1963 plants. The plant's latest annual generation was 436,530 MWh, achieving a capacity factor of 50.8%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
66.8K MWh
Latest Month
436.5K MWh
Annual Generation
50.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
534 lb/MWh
NOx
0.284 lb/MWh
SO₂
0.003 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
62.8%
Annual Net Gen
539 GWh
CO₂eq
534 lb/MWh
Subregion
RFC Michigan
2013
$965/kW
Est. Construction Cost
Total estimated cost: $94.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
REO Town Substation · 138 kV
Substation Distance
0 km
Operator
Lansing Board of Water & Light
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
CONS.LBWL.ASM2
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Lansing BWL REO Town PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.