Query
Lansing BWL REO Town Plant
Type
Entity Briefing
Entity
Lansing BWL REO Town Plant
Generated
2026-10-13T02:27:09.415Z

Briefing on Lansing BWL REO Town Plant

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
98 MW
Capacity
Operating
Current status
2013
Operating since
3
Generators
50.8%
Capacity factor
437 GWh
Annual generation
Briefing/plantOperating

Lansing BWL REO Town Plant is a 98 MW Natural Gas Fired Combined Cycle asset in MISO (Midcontinent), currently Operating.

Lansing BWL REO Town Plant is reported in Michigan since 2013 under Lansing Board of Water and Light. Available operating and financial measures include 50.8% capacity factor and 437 GWh annual generation; $965/kW reported CapEx.

Location
Ingham, Michigan
Technology
Natural Gas Fired Combined Cycle
Owner / parent
Lansing Board of Water and Light
Operator
Lansing Board of Water and Light
Grid
MISO (Midcontinent)
Plant ID
58427

What stands out

1

Lansing BWL REO Town Plant is a 98 MW Natural Gas Fired Combined Cycle asset in Michigan with status Operating.

2

Latest annual operating measures report 50.8% capacity factor and 437 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

4

Latest linked story: “Simmering over gas” (City Pulse, 2024-07-25).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
RFC
State rank
#26 of 62
National rank
#975 of 2,025

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.