1.6 MW Wind operating in Winneshiek, IA
1.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
43.3091, -91.8177
County
Winneshiek, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luther College Wind Energy Project LLC | — | — |
| Owner(s) | Luther College Wind Energy Project LLC | — | — |
| Status | Operating | — | — |
The Luther College Wind Project, located in Winneshiek County, Iowa, is a 1.6 MW wind power facility that commenced operations in 2011. The plant is owned and operated by Luther College Wind Energy Project LLC. It consists of a single onshore wind turbine manufactured by GE Wind, model GE1.6-82.5, with a rotor diameter of 82.5 meters and a hub height of 80 meters. The plant's primary fuel source is wind (WND).
The Luther College Wind Project operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the MRO NERC region. In the most recent year of data, the plant generated 2,652 MWh of electricity, achieving a capacity factor of 18.9%. The plant's size ranks it as the 111th largest wind facility in Iowa out of 122, and 1369th nationally out of 1424.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
230 MWh
Latest Month
2.7K MWh
Annual Generation
18.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Decorah Substation · 69 kV
Substation Distance
< 10 km
Operator
Alliant Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Luther College Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.