Luther College Wind Project is a 2 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.
Luther College Wind Project is reported in Iowa since 2011 under Luther College Wind Energy Project LLC. Available operating and financial measures include 18.9% capacity factor and 3 GWh annual generation; $1895/kW reported CapEx.
- Location
- Winneshiek, Iowa
- Technology
- Onshore Wind Turbine
- Owner / parent
- Luther College Wind Energy Project LLC
- Operator
- Luther College Wind Energy Project LLC
- Grid
- MISO (Midcontinent)
- Plant ID
- 58407
What stands out
Luther College Wind Project is a 2 MW Onshore Wind Turbine asset in Iowa with status Operating.
Latest annual operating measures report 18.9% capacity factor and 3 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #111 of 123
- National rank
- #1390 of 1,442
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.