Search plants, projects, owners, and states
28 MW Batteries (14 MW) + Solar Photovoltaic (14 MW) operating in Yuma, AZ
28 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2013
Operating Since
Coordinates
33.0270, -113.3489
County
Yuma, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arizona Public Service Co | Arizona Public Service | — |
| Owner(s) | Arizona Public Service Co | Pinnacle West Capital | — |
| Status | Operating | operating | — |
The Hyder II Hybrid plant is a 28 MW hybrid facility located in Yuma County, Arizona. It began operating in 2013 and is owned by Pinnacle West Capital and operated by Arizona Public Service Co. The plant utilizes both solar photovoltaic and battery storage technologies. The battery energy storage system (BESS) has a capacity of 42 MWh, providing 3 hours of duration and using lithium-ion battery chemistry (LIB). The solar component uses single-axis tracking.
Hyder II Hybrid is interconnected to the Arizona Public Service Company balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year of data, the plant generated 32,538 MWh, achieving a capacity factor of 13.2%. The installed cost of the plant was $3,700.85 per kW. The plant is ranked 63rd out of 68 plants in Arizona and 659th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Arizona Public Service Company (AZPS)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.2K MWh
Net Discharge
32.5K MWh
Annual Net Energy
13.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Data from 2013–2024
$11.0/MWh
Energy Value
$25.5/MWh
Capacity Value
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hyder II HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.