Briefing/plantOperating
Hyder II Hybrid is a 28 MW Batteries asset in Arizona, currently Operating.
Hyder II Hybrid is reported in Arizona since 2013 under Pinnacle West Capital. Available operating and financial measures include 13.2% capacity factor and 33 GWh annual generation; $11.0/MWh reported energy value.
- Location
- Yuma, Arizona
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Pinnacle West Capital
- Operator
- Arizona Public Service Co
- Grid
- Arizona Public Service Company
- Plant ID
- 58383
What stands out
1
Hyder II Hybrid is a 28 MW Batteries asset in Arizona with status Operating.
2
Latest annual operating measures report 13.2% capacity factor and 33 GWh annual generation.
3
Available financial measures include $11.0/MWh energy value.
Market and operating context
- Balancing authority
- Arizona Public Service Company
- NERC region
- WECC
- State rank
- #56 of 61
- National rank
- #503 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.